📝 Abstract

There is a considerable amount of ongoing research on the use of Bayesian control charts for detecting a shift from a good quality distribution to a bad quality distribution in univariate and multivariate processes. It is widely claimed that Bayesian control charts are economically optimal; see, for example, Calabrese (1995) [Bayesian process control for attributes. Management Science, DOI: 10.1287/mnsc.41.4.637] and Makis (2008) [Multivariate Bayesian control chart. Operations Research, DOI: 10.1287/opre.1070.0495]. Some researchers also generalize the optimality of controls defined based on posterior probabilities to the class of partially observable Markov decision processes. This note points out that the existing Bayesian control charts cannot generally be optimal because many years ago an analytical counterexample was provided by Taylor (1965) [Markovian sequential replacement processes. The Annals of Mathematical Statistics, DOI: 10.1214/aoms/1177699796].

💡 Deep Analysis

Deep Dive into Remarks on Bayesian Control Charts.

There is a considerable amount of ongoing research on the use of Bayesian control charts for detecting a shift from a good quality distribution to a bad quality distribution in univariate and multivariate processes. It is widely claimed that Bayesian control charts are economically optimal; see, for example, Calabrese (1995) [Bayesian process control for attributes. Management Science, DOI: 10.1287/mnsc.41.4.637] and Makis (2008) [Multivariate Bayesian control chart. Operations Research, DOI: 10.1287/opre.1070.0495]. Some researchers also generalize the optimality of controls defined based on posterior probabilities to the class of partially observable Markov decision processes. This note points out that the existing Bayesian control charts cannot generally be optimal because many years ago an analytical counterexample was provided by Taylor (1965) [Markovian sequential replacement processes. The Annals of Mathematical Statistics, DOI: 10.1214/aoms/1177699796].

📄 Full Content

1

Remarks on Bayesian Control Charts

Amir Ahmadi-Javid†* and Mohsen Ebadi† † Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran

  • Corresponding author; email address: ahmadi_javid@aut.ac.ir arXive: December 18, 2017 Abstract. There is a considerable amount of ongoing research on the use of Bayesian control charts for detecting a shift from a good quality distribution to a bad quality distribution in univariate and multivariate processes. It is widely claimed that Bayesian control charts are economically optimal; see, for example, Calabrese (1995) [Bayesian process control for attributes. Management Science, DOI: 10.1287/mnsc.41.4.637] and Makis (2008) [Multivariate Bayesian control chart. Operations Research, DOI: 10.1287/opre.1070.0495]. Some researchers also generalize the optimality of controls defined based on posterior probabilities to the class of partially observable Markov decision processes. This note points out that the existing Bayesian control charts cannot generally be optimal because many years ago an analytical counterexample was provided by Taylor (1965) [Markovian sequential replacement processes. The Annals of Mathematical Statistics, DOI: 10.1214/aoms/1177699796].

Keywords: Bayesian control charts, Economic design, Partially Observable Markov Decision Process (POMDP), Stochastic optimal control, Posterior probabilities.

2

  1. Introduction Bayesian control charts, originated by Girshick and Rubin (1952), are not new in the literature, and their economic design has received increasing attention over the last two decades (see Tagaras and Nikolaidis (2002), and Nikolaidis and Tagaras (2017), and references therein). Girshick and Rubin (1952) discussed the optimality of Bayesian charts for the first time. They considered only a special case of a discrete-time production system that produces at discrete instants of time, and where 100% inspection is carried out (inspection costs are ignored). For this special setting, they studied the optimum quality control policy which specifies when to terminate production and put the machine in the repair shop in order to minimize the long-run expected average cost (see Ahmadi-Javid and Ebadi (2017) for important remarks on a class of optimal quality control problems with long-run expected average cost objective functions). They explicitly determined the following optimal policy (Tagaras, 1994): “Stop and repair at time if and only if the posterior probability at time that the process is in the bad state exceeds a control limit .” Note that their proposed policy was initially presented in a different form. To see the equivalence to the above form, the readers are referred to the proof of Lemma 1 in page 116 of Girshick and Rubin (1952).

  2. Discussion Unfortunately, by generalizing the particular optimality result obtained by Girshick and Rubin (1952), several papers made misleading statements that imply the optimality of Bayesian control charts and the non-optimality of non-Bayesian control charts in general settings. In Table 1, a few of these statements are collected. This table provides a chain of citations starting from 1995.
    Makis (2008) in the abstract of his paper explicitly claimed that he proved the optimality of a Bayesian control chart. However, he, and similarly Calabrese (1995) and Makis (2009), did not provide any proof and only cited the two papers Taylor (1965, 1967), where their statements have 3

exactly the same wording. Let us now examine these Taylor’s papers to make sure that they do not extend the optimality of Bayesian charts to more general settings, and that they only reassessed the results obtained by Girshick and Rubin (1952).

Table 1 A list of misleading statements regarding the optimality of Bayesian charts Paper Journal Statements Calabrese (1995)
Management Science “Taylor (1965, 1967) has shown that non-Bayesian techniques are not optimal …” (page 637. line 16)

“A Bayes statistic together with a simple control limit policy is shown to be an economically optimal method of process control” (page 638, line 9) Makis (2008) Operations Research “It is well known that these traditional, non-Bayesian process control techniques are not optimal “( Abstract: page 795, line 4)

“Under standard operating and cost assumptions, [in this paper] it is proved that a [Bayesian] control limit policy is optimal, and an algorithm is presented to find the optimal control limit and the minimum average cost."(Abstract: page 487, line 8)

“Taylor (1965, 1967) has shown that non-Bayesian techniques are not optimal …” (page 488, line 4) Makis (2009) European Journal of Operational Research “It is well known that this traditional non-Bayesian approach to a control chart design is not optimal” (Abstract: page 487, line 3)

“Taylor (1965, 1967) has shown that non-Bayesian techniques are not optimal…” (page 796

…(Full text truncated)…