Approximating Minimum-Cost k-Node Connected Subgraphs via Independence-Free Graphs

We present a 6-approximation algorithm for the minimum-cost $k$-node connected spanning subgraph problem, assuming that the number of nodes is at least $k^3(k-1)+k$. We apply a combinatorial preproces

Approximating Minimum-Cost k-Node Connected Subgraphs via   Independence-Free Graphs

We present a 6-approximation algorithm for the minimum-cost $k$-node connected spanning subgraph problem, assuming that the number of nodes is at least $k^3(k-1)+k$. We apply a combinatorial preprocessing, based on the Frank-Tardos algorithm for $k$-outconnectivity, to transform any input into an instance such that the iterative rounding method gives a 2-approximation guarantee. This is the first constant-factor approximation algorithm even in the asymptotic setting of the problem, that is, the restriction to instances where the number of nodes is lower bounded by a function of $k$.


📜 Original Paper Content

🚀 Synchronizing high-quality layout from 1TB storage...